How To
- Navigate to Modules > Production > View production order
- Locate the 'undo' icon, which is situated to the right of each production order (OP). Note that this option is only available for production orders that have not had materials assigned and have not been dispatched.
- In the pop-up dialog box, click on the ‘Undo PJ’ button to reverse the production order.