Below you can find the different options available in the General Settings configuration:
Production Settings
1. Material Width for Printed Labels
Is the width added to the labels & gap for printed labels. Note that if the material width is changed in the production SKU configuration, that will override this parameter.
2. Material Width for Blank Labels
Is the width added to the labels & gap for blank labels. Note that if the material width is changed in the production SKU configuration, that will override this parameter.
3. Material Width with Black mark.
Is an standard gap added to the material width to include the back mark.
Raw Material Settings
1. Aceptable Scrap
Is the deviation percentage that will tolerate until the systems sends a warning when cutting a jumbo roll.
2. Aceptable Weight Deviation
Is the deviation percentage that will tolerate until the systems sends a warning when raw material left overs are added to the inventory.
SKU Settings
1. VAT
Is the tax applied to manufactured items.
2. Custom SKU Code
Here you can personalize the codification for SKUs.
Sales Settings
1. Profit Margin (Blank Labels)
Is the profit added to cost in price estimates for blank labels.
2. Profit Margin (Printed Labels)
Is the profit added to cost in price estimates for printed labels.
3. Box Height
Is the height for a standard box for delivering labels.
4. Die Cut Deviation
Is the percentage applied to select the dies suggested in the price calculation.
5. Extra m2 for material
For estimates is automatically considered this percentage as average scrap performance.
6. Extra (Calculation a shipping cost)
For estimates is automatically considered this percentage of the material value as shipping cost.
7 Extra (Calculating a printing job)
For estimates is automatically added this percentage of the material cost as average for printing jobs.
8. Extra for Each change of color.
For estimates is automatically added this percentage of the material cost as average for each change of color in a production job.
9. Extra for each change of text.
For estimates is automatically added this percentage of the material cost as average for each change of design in a production job.
10. Extra Scrap in materials width
Is the material width added to price estimates.
11. Extra Scrap for Plate Size
Is the size added to calculate the plate width.
12. Extra Scrap Around in Plate Size
Is the size added to calculate the plate length.
Distpach Settings
1. Default Location
2. Label Height
Is the height for the dispatch label.
3. Label Width